How do you really feel in regards to A Step-by-Step Guide to Installing a Bathtub?


Tools You Need to Install a New Bathtub
Mounting a bathtub isn't specifically rocket science, but it does need strong plumbing, woodworking, and also sometimes, tiling abilities. Changing an old tub with a brand-new one is also a moderately hard task. If the old bathtub is readily easily accessible, the task can relocate quickly; if you have to open up a wall surface to remove the old tub as well as place the brand-new bath tub, the task is much harder. In either case, the project is within a home handyman's skills, although you will require an assistant to vacate the old bathtub and also embeded in the brand-new one. See to it you have actually certified on your own for the work and also fit trying it. Instead of employing a specialist to take control of a halfway-completed job, it is much better to think about using one prior to you start. Possibilities are you may need a professional plumber to make tube links.
This write-up will certainly assist you set up a new bathtub in your bathroom if you have actually currently gotten a new tub and also do not need to change the setup of your previous water pipelines.
Your tools and material list must make up the following:
  • New Tub
  • Hammer

  • Pipe Wrenches

  • Prybar

  • Safety Glasses

  • Level

  • Pliers

  • Flexible Wrench

  • Putty Blade

  • Screwdriver

  • Cold Knife

  • Measuring tape

  • Pipeline Caps


  • Getting ready for the Installment


    To start with, the sustaining frame supplied with the bathroom needs to be fitted (if called for) according to the maker's directions. Next, fit the taps or mixer to the bath tub. When suitable the faucet block, it is very important to make certain that if the tap comes with a plastic washing machine, it is fitted in between the bath and also the faucets. On a plastic bath, it is also sensible to fit a sustaining plate under the faucets device to stop stress on the bathtub.
    Fit the flexible faucet ports to the bottom of the two taps making use of 2 nuts as well as olives (in some cases supplied with the bathtub). Fit the plug-hole electrical outlet by smearing mastic filler round the sink outlet hole, and afterwards pass the electrical outlet through the hole in the bathroom. Utilize the nut supplied by the manufacturer to fit the plug-hole. Check out the plug-hole electrical outlet for an inlet on the side for the overflow pipe.
    Next off, fit completion of the versatile overflow pipeline to the overflow outlet. After that, screw the pipeline to the overflow face which should be fitted inside the bathroom. Make sure you utilize all of the provided washers.
    Link the trap to the bottom of the waste outlet on the tub by winding the thread of the waste electrical outlet with silicone mastic or PTFE tape, as well as screw on the trap to the electrical outlet. Connect all-time low of the overflow tube in a similar manner.The bathroom ought to now prepare to be suited its final placement.

    Removing Old Taps


    If you require to change old taps with brand-new ones as a part of your installation, after that the first thing you ought to do is separate the supply of water. After doing so, activate the taps to drain pipes any type of water remaining in the system. The process of removing the existing faucets can be quite bothersome due to the limited access that is commonly the case.
    Utilize a container wrench (crowsfoot spanner) or a tap tool to reverse the nut that connects the supply pipelines to the taps. Have a fabric all set for the staying water that will certainly originate from the pipes. When the supply pipelines have been gotten rid of, use the exact same device to loosen the nut that holds the faucets onto the bath/basin. You will need to quit the single taps from transforming during this process. As soon as the taps have been gotten rid of, the holes in the bath/basin will need to be cleaned of any kind of old securing compound.
    Prior to going on to fit the new faucets, contrast the pipe connections on the old faucets to the brand-new taps. If the old faucets are longer than the brand-new taps, then a shank adapter is needed for the brand-new taps to fit.

    Setting up the Bath tub


    Making use of the two wooden boards under its feet, position the bath tub in the required setting. The wood boards are helpful in uniformly spreading out the weight of the bath tub over the area of the boards instead of focusing all the weight onto four little factors.
    The following goal is to guarantee that the tub is leveled all round. This can be attained by examining the spirit level as well as changing the feet on the bath tub till the spirit level reads level.
    To set up faucets, fit all-time low of the outermost flexible tap connector to the suitable supply pipeline by making a compression sign up with; after that do the very same for the other tap.
    Switch on the supply of water as well as examine all joints and also brand-new pipework for leaks as well as tighten them if needed. Load the bath tub as well as additionally check the overflow outlet and the normal outlet for leaks.
    Lastly, repair the bath paneling as explained in the maker's user's manual. Tiling as well as securing around the tub must wait up until the tub has actually been utilized a minimum of once as this will certainly resolve it right into its last placement.

    Suitable New Touches


    If the tails of the brand-new taps are plastic, then you will need a plastic connector to avoid damage to the thread. One end of the connector fits on the plastic tail of the tap and the other end gives a link to the current supply pipelines.
    If you need to fit a monobloc, then you will require reducing couplers, which attaches the 10mm pipeline of the monobloc to the common 15mm supply pipe.
    Next, position the faucet in the placing opening in the bath/basin making certain that the washers remain in location in between the faucet and the sink. Safeguard the faucet in place with the supplier supplied backnut. Once the faucet is safely in place, the supply pipes can be attached to the tails of the faucets. The taps can either be attached by utilizing corrugated copper piping or with typical tap connectors. The previous type should be attached to the faucet ends first, tightening up just by hand. The supply pipes can later on be linked to the other end. Tighten both ends with a spanner after both ends have actually been linked.

    Tiling Around the Bathtub


    In the location where the bath meets the floor tile, it is required to secure the joins with a silicone rubber caulking. This is necessary as the installation can move sufficient to crack a stiff seal, causing the water to pass through the wall surface between the bathroom and the tiling, bring about difficulties with dampness and also possible leakages to the ceiling below.
    You can select from a variety of coloured sealers to assimilate your components as well as fittings. They are offered in tubes and also cartridges, and are capable of sealing voids up to a size of 3mm (1/8 inch). If you have a larger void to fill, you can load it with twists of soaked paper or soft rope. Remember to always fill up the bath tub with water before securing, to allow for the motion experienced when the bathtub is in use. The sealer can crack fairly very early if you do not take into account this motion before securing.
    Alternatively, ceramic coving or quadrant ceramic tiles can be made use of to edge the bathroom or shower tray. Plastic strips of coving, which are easy to use and also cut to dimension, are also quickly readily available on the market. It is suggested to fit the tiles utilizing waterproof or waterproof sticky and also grout.

    A Step-by-Step Guide to Installing a Bathtub


    Is your bathtub looking a bit dated lately? Believe it or not, installing a new one is a project you can do yourself. Whether your bathtub is broken or doesn’t fit in with your current bathroom’s design, you can fix it without having to hire a contractor or paying labour costs.



    But, beyond saving money, there are other benefits of installing your own bathtub. When you do this project yourself, you can customise every step of the process. You can also make sure the finished product looks exactly the way you want it to.



    This DIY project is quite involved, but by doing some research, preparing your bathroom and using the right equipment, it is definitely one you can take on. This guide will help you understand the technical procedures behind installing a new bathtub.


    Remove the Existing Bathtub


    To remove the old bathtub, you will need to turn the water supply off before you start any work. After you turn the water off, there will likely still be some water left in your plumbing system, which you can remove by turning on a faucet below the level of the bathtub. Once the water stops running, you are ready to start working.



    The easiest way to remove the tub is to remove the faucet, handles and other piping and then pull the tub out from the wall. If this doesn’t work in your situation, you will need to remove part of the wall, remove the piping and then slide the tub out.


    Choose the Right Bathtub


    The ideal way to replace your bathtub is to find one that has the exact dimensions and has the drain and faucet on the same side as your old one. This way, it will fit in the same place and you won’t have to change the piping system in your bathroom. Choose a tub that matches your home’s decor and fits with the style of the bathroom.


    Install the Plumbing and Ledger Board


    You can purchase a tub drain kit at a hardware store which will have all the pieces you will need for your new tub’s plumbing. Follow the instructions that came with the kit to install the plumbing in the new tub and then take measurements to make sure the plumbing in the tub will align with the plumbing in your bathroom. If it doesn’t, now is the time to make necessary adjustments.



    Some bathtubs need a ledger board that is installed on the wall behind the tub to help support it. If your new bathtub requires one, the directions that came with it will tell you how high it should be installed. If your old bathtub had a ledger board, and it is still in good condition, you can adjust its height to match the new bathtub.


    Install the Bathtub


    When the plumbing and ledger board are ready, you can install the new bathtub. Carefully lower it into the space, being careful not to damage the tub, wall, plumbing or ledger board. Since bathtubs are very heavy and you will need to line the tub up exactly, it is wise to have someone help you with this step.



    Once the tub is in place, it needs to be perfectly level, so use a bubble level instead of estimating how level the tub is. Put the level on the top edge of the tub, not the bottom on the inside, since many tubs are designed with a sloped bottom.



    If the bathtub isn’t level, adjust the ledger board and shift the tub until it is. When it is level, use screws to attach the tub to the wall studs. Most bathtubs have pre-drilled holes in the upper flange, so use these but do not over tighten the screws.


    Hook up the Plumbing


    Now that the bathtub is installed, it needs to be attached to your plumbing system. First, install the shoe fitting under the tub and drain pipe, then the overflow pipe and then the drain flange. Your tub plumbing kit will include specific instructions on how to install these pieces.


    Install the Bathtub Surround


    A bathtub surround will protect the walls around the tub from water damage and can give your new bathtub a more finished look. To install one, make sure the wall is completely clean and dry so that the adhesive will be able to hold the surround securely. Then, measure the surround and mark the same dimensions on the wall above the tub.



    Following the directions that came with the surround adhesive, apply it to the wall. Press the surround against the wall on top of the adhesive and then pull it away for about three minutes to activate the adhesive, then apply the surround again. Keep in mind that this is the most common way to use an adhesive, but you should check the instructions on the package for any special steps.



    If there is any excessive adhesive around the sides of the surround, you can use mineral spirits to remove it. Then use masking tape to hold the surround panels in place until the adhesive is dry. Using silicone, seal all the cracks between the surround panels and the gap between the bottom of the panels and the top of the bathtub.



    If you want to install tile above your bathtub, instead of a bathtub surround, the process will be very similar. But, you will need to measure and cut tiles and install each one individually, using tile spacers to make sure they are evenly spaced. You will then use grout to fill in the spaces between the tiles.

    https://www.hss.com/blog/bathroom/a-step-by-step-guide-to-installing-a-bathtub/


    How to Install a Bathtub: Install an Acrylic Tub and Tub Surround

    As a keen reader about Tools You Need to Install a New Bathtub , I assumed sharing that piece of content was a great idea. Enjoyed reading our piece? Please share it. Let someone else discover it. Thank you for your time spent reading it.



    Schedule A Free Estimate

    Report this page